Sample report · land and ground-mount solar

Sample acreage near Kleskun Hill, County of Grande Prairie, Alberta

A 38-acre square drawn on open land. No owner, address or lot lines are shown. Slope, trees, shade and solar yield come from the 2022 open LiDAR survey.
38.2 acarea drawn (15.5 ha)
17.7 acgood for ground-mount panels
5.3%average slope (90% of the land under 9.7%)
5.9 MWpossible solar farm (DC)
8.1 GWh/yrestimated yearly output
1.6 kmto the nearest mapped power line

Where panels could go Estimate

Shaded LiDAR relief of the drawn area: green suitable, red unsuitable
SuitableToo steep, north-facing or shadedEdge setback (15 m)Trees

Shaded relief of the 2022 LiDAR surface model (1 m). Not a photo. Contains information licensed under the Open Government Licence – Canada (NRCan HRDEM).

Land breakdown

Area drawn38.2 ac
After a 15 m edge setback32.9 ac
Trees and bush8.0 ac
Buildings or tall objects1.5 ac
Too steep for racking1.0 ac
Facing north (weak sun)4.3 ac
Shaded by trees or terrain2.5 ac
Suitable for panels17.7 ac
Nearest mapped power line1.6 km (144000 V)
Nearest mapped substation9.1 km (Clairmont Lake Substation)

Power lines and substations: © OpenStreetMap contributors (ODbL); some lines may be missing.

Solar farm output by month Estimate

Jan: 378,193 kWhFeb: 568,698 kWhMar: 832,248 kWhApr: 885,228 kWhMay: 894,263 kWhJun: 830,605 kWhJul: 844,980 kWhAug: 818,578 kWhSep: 736,732 kWhOct: 601,260 kWhNov: 385,938 kWhDec: 326,328 kWh
JanFebMarAprMayJunJulAugSepOctNovDec

5,867 kW of fixed racks at 48° tilt facing south, rows spaced for winter sun (ground cover ratio 0.4). Yield 1,381 kWh per kW per year from PVGIS (EU JRC).

Not checked in this sample

flood hazard, wetlands, zoning and municipal setbacks, soil and farmland class, pipelines, wells and rights-of-way (see Wells on My Land), title and easements.

ESTIMATE ONLY – NOT A LEGAL SURVEY OR AN ENGINEERING STUDY. Boundaries, areas and slopes can be off by metres. Only a licensed land surveyor can establish legal boundaries. Confirm grid connection with your utility and land use with your municipality.

Made and run in the USA by born and raised North Americans. Prepared 2026-11-27.